Kaplan Homes YouTube Episode 4 – Internal Under Slab Plumbing

Episode 4 shows the 3rd stage of building a Kaplan Home – the plumbing under the house which needs to be installed before the concrete slab is poured.
Have you ever wondered how the water from your shower, sink or toilet gets out to the sewer system?
This is your chance to view the pipes before they are buried underneath the slab and hear Warren explain some of the finer details such as a part of the termite proofing system.
Next week we’ll be showing how the we prepare the structure and steel for the concrete slab to continue our video series showing the whole process of constructing a house

Smarter Building Starts Here
Experience a Kaplan Display Home from the comfort of your couch.
Sign up for expert tips, inspiration and the latest from Kaplan Homes.
7 DISPLAY HOME LOCATIONS ACROSS SYDNEY






